How we install a plant floor without stopping the line
- Free on-site survey. Call (404) 480-0962 or request one online. We walk the plant, test the slab for moisture and contamination, and map the zones.
- Zone plan and shutdown windows. We agree which areas run in which window, and the return to service time for each, in writing before anyone arrives.
- Containment and preparation. The area is sealed off from live production, then the slab is shot blasted or ground back to sound, clean concrete.
- System build and coving. The specified build goes down zone by zone, with coving formed at walls, drains and equipment plinths.
- Cure, handover and sign off. Fast cure materials bring most areas back into service within 24 hours, and we walk the finished floor with your maintenance lead before we leave site.
Food plant flooring in Gainesville: what plant managers ask
How much does food processing plant flooring cost in Gainesville?
It comes down to square footage, the system specified for each zone, and the state of the slab underneath, so every plant is surveyed and quoted for free. Urethane cement in a wet processing area is a heavier and more expensive build than a coating in dry storage, and stripping out a failed floor or decontaminating fat-soaked concrete adds preparation time. The quote is itemized by zone, so the work can be phased across several shutdowns rather than funded in one hit.
Will the floor survive daily hot washdown?
That is precisely what urethane cement is specified for. Standard epoxy softens and debonds under repeated boiling water and thermal shock, and it is the single most common failure we get called out to replace. Urethane cement expands and contracts at close to the same rate as the concrete beneath it, so the bond holds through the temperature swing instead of tearing itself off the slab.
Can the floor meet USDA and third party audit requirements?
Yes. The systems we install are seamless, non-porous and coved at every wall and drain, which is what an inspector or a third party auditor is looking for. There are no grout lines or open joints to harbor bacteria, and the surface cleans back to bare resin. We supply the manufacturer data sheets and compliance documentation for your audit file.
How much production time will we lose?
Less than most plant managers expect. We work nights, weekends and planned shutdowns, phase the job zone by zone, and use fast cure materials where the window is tight, so many areas are back in service within 24 hours. The phasing plan and the return to service time for every zone are agreed in writing before any work starts.