Our epoxy installation process
- Free on-site quote. Call (404) 480-0962 or request one online. We measure the space and check slab condition and moisture in person.
- Diamond grinding. We grind the concrete to open the surface so the epoxy bonds mechanically instead of sitting on top.
- Repair and patching. Cracks, pits, and spalled areas are filled and leveled before any coating goes down.
- Base coat and broadcast. The pigmented base goes down, followed by your flake, quartz, or metallic finish.
- Topcoat and cure. A chemical-resistant topcoat locks in the finish. Walk on it in about a day, park on it after three.
Buford epoxy installation: common questions
How much does epoxy floor installation cost in Buford?
Pricing depends on slab condition, square footage, and the system you choose, so we quote every Buford job individually and for free. Flake garage floors sit at the accessible end, metallic showroom floors at the premium end, and old coating removal adds prep either way. Larger continuous areas price better per square foot, and bundling with other flooring work usually earns package pricing.
Which epoxy system is right for my space?
Match the system to the traffic. Garages and basements almost always want flake for its texture and forgiveness. Customer-facing retail and living areas are where metallic earns its premium. Wet or hard-working areas call for quartz or solid color with a gritted topcoat. At the quote we look at how the space is used and spec it rather than selling one finish for everything.
How long does an epoxy floor last?
A professionally installed system on a properly prepared Buford slab typically runs fifteen to twenty years residentially, and commercial floors can be refreshed with a new topcoat as the wear layer ages instead of being fully redone. Prep decides lifespan: mechanically ground, moisture-tested concrete holds a coating; a shortcut install does not.
How long does installation take?
Most garages and basements are done in one to two days on site, with larger commercial floors running two to four depending on repair and build thickness. Cure time matters more than install time: light foot traffic after about 24 hours, vehicles and heavy loads after 72. We schedule installs around business hours where a space cannot close.